|
Kerosene Vale Ash Repository
|
|
|
The Kerosene Vale ash repository was originally constructed between 1960 and 1990. During this time it was filled with a combination of by-product ash from the Wallerawang Power Station and mining spoil. The ash repository was capped in around 1990.
In 2001, there was an operational need to change from wet to dry ash-producing activities. In 2002, approval was granted to use the Kerosene Vale Ash Repository area for dry ash storage.
Stage 1 of the storage facility was designed to operate for a period of five years in a limited area over the Kerosene Vale Ash Repository. As this area began to reach capacity, Delta sought approval to expand the storage area. In 2008, approval was granted to expand the storage area, Stage 2, subject to a number of conditions.
Planning Approval
The Stage 2 activities were assessed under Part 3A of the Environmental Planning and Assessment Act 1979. The Minister for Planning granted approval on 26 November 2008.
Click on the the link to view:
Project approval with Schedule 2 - Consent Conditions (1.4MB)
Operational Environmental Management Plan, April 2009 (13.5MB)
A copy of the Environmental Assessment and the Submissions Report are available at Department of Planning website – KV project
Contact details
For more information please contact Margaret Miller, Corporate Affairs Manager during office hours on 02 9285 2700 or by email on margaret.miller@de.com.au
After hours complaints - call Wallerawang Power Station on 02 6352 8611
Postal address:
Western Environment Manager
Delta Electricity
PO Box Q863,
QVB NSW 1230
September 2009.
|
|